NASA 1852.223-71 Frequency Authorization. Basic (APR 2015) (Current)

As prescribed in 1823.7101, the contracting officer shall insert the clause at, 1852.223-71 Authorization for Radio Frequency Use, in solicitations and contracts calling for developing, producing, constructing, testing, or operating a device for which a radio frequency equipment authorization is required.

AUTHORIZATION FOR RADIO FREQUENCY USE (APR 2015)

(a) The Contractor or subcontractor shall obtain equipment authorization for use of radio frequencies required in support of this contract following the procedures in NPR, 2570.1, NASA Radio Frequency (RF) Spectrum Management Manual.

(b) For any experimental, developmental, or operational equipment for which the appropriate equipment frequency authorization has not been made, the Contractor or subcontractor shall provide the technical and operating characteristics of the proposed electromagnetic radiating device to the Center/Facility Spectrum Manager during the initial planning, experimental, or developmental phase of contractual performance.

(c) This clause, including this paragraph (c), shall be included in all subcontracts that call for developing, producing, testing, or operating a device for which a radio frequency authorization is required.

(End of clause)

(c) This clause, including this paragraph (c), shall be included in all subcontracts that call for developing, producing, testing, or operating a device for which a radio frequency authorization is required.

Mandatory (Exception);
  NASA 1812.301 (Applies to contracts calling for developing, producing, constructing, testing, or operating a device for which a radio frequency equipment authorization is required.)

Working with a set of FAR clauses from an RFP or contract?

Try pasting them into our tool to instantly generate a risk profile, including the basic flow down recommendation.

Info

Works best with Chrome and Edge browsers!