DFARS 252.228-7005 Mishap Reporting and Investigation Involving Aircraft, Missiles, and Space Launch Vehicles. Basic (Nov 2019)

As prescribed in 228.370(d), use the clause at 252.228-7005, Mishap Reporting and Investigation Involving Aircraft, Missiles, and Space Launch Vehicles, in solicitations and contracts that involve the manufacture, modification, overhaul, or repair of aircraft, missiles, and space launch vehicles.
 

MISHAP REPORTING AND INVESTIGATION INVOLVING AIRCRAFT, MISSILES, AND SPACE LAUNCH VEHICLES (NOV 2019) 

      (a)  The Contractor shall report promptly to the Administrative Contracting Officer all pertinent facts relating to each mishap involving an aircraft, missile, or space launch vehicle being manufactured, modified, repaired, or overhauled in connection with this contract. 

      (b)  If the Government conducts an investigation of the mishap, the Contractor shall cooperate and assist the Government's personnel until the investigation is complete. 

      (c)  The Contractor shall include a clause in subcontracts under this contract to require subcontractor cooperation and assistance in mishap investigations. 

(End of clause)
 

The Contractor shall include a clause in subcontracts under this contract to require subcontractor cooperation and assistance in mishap investigations. 

Mandatory;
(Applicable to solicitations and contracts that involve the manufacture, modification, overhaul, or repair of aircraft, missiles, and space launch vehicles.);

52.209-1 Qualification Requirements.

52.212-4 Contract Terms and Conditions—Commercial Items.

52.213-4 Terms and Conditions—Simplified Acquisitions (Other Than Commercial Items).

52.246-1 Contractor Inspection Requirements.

52.246-11 Higher-Level Contract Quality Requirement.

52.246-12 Inspection of Construction.

52.246-13 Inspection—Dismantling, Demolition, or Removal of Improvements.

52.246-14 Inspection of Transportation.

52.246-15 Certificate of Conformance.

52.246-16 Responsibility for Supplies.

52.246-2 Inspection of Supplies—Fixed-Price.

52.246-3 Inspection of Supplies—Cost-Reimbursement.

52.246-4 Inspection of Services—Fixed-Price.

52.246-5 Inspection of Services—Cost-Reimbursement.

52.246-6 Inspection—Time-and-Material and Labor-Hour.

52.246-7 Inspection of Research and Development—Fixed-Price.

52.246-8 Inspection of Research and Development—Cost-Reimbursement.

52.246-9 Inspection of Research and Development (Short Form).

52.247-4 Inspection of Shipping and Receiving Facilities.

52.246-26 Reporting Nonconforming Items.

52.204-26 Covered Telecommunications Equipment or Services-Representation.

252.215-7015 Program Should-Cost Review.

252.217-7005 Inspection and Manner of Doing Work.

252.239-7000 Protection Against Compromising Emanations.

1852.246-71 Government Contract Quality Assurance.

1852.246-72 Material Inspection and Receiving Report.

5252.246-9512 INSPECTION AND ACCEPTANCE (NAVAIR)(OCT 2005)

5252.246-9514 INSPECTION AND ACCEPTANCE OF TECHNICAL DATA AND INFORMATION (NAVAIR)(FEB 1995)

5252.246-9503 Significance of Systems Engineering Technical Reviews Required under this Contract (NAVAIR)

3052.217-92 Inspection and manner of doing work (USCG).

3052.217-96 Title (USCG).

3052.217-100 Guarantee (USCG).

5152.236-5900 Electrical and Structural Building Standards for Construction Projects

552.211-70 Substantial Completion.

552.246-70 Source Inspection by Quality Approved Manufacturer.

Clause Discussion

Leave a comment

Working with a set of FAR clauses from an RFP or contract?

Try pasting them into our tool to instantly generate a risk profile, including the basic flow down recommendation.

Info

Works best with Chrome and Edge browsers!