NASA 1852.228-71 Aircraft Flight Risks. Basic (DEC 1988) (Current)

As prescribed in 1828.311-270(a), the contracting officer must insert the clause at 1852.228-71, Aircraft Flight Risks, in all cost-reimbursement contracts for the development, production, modification, maintenance, or overhaul of aircraft, or otherwise involving the furnishing of aircraft to the contractor, except when the aircraft are covered by a separate bailment.

AIRCRAFT FLIGHT RISKS (DEC 1988)

(a) Notwithstanding any other provision of this contract (particularly paragraph (g) of the Government Property (Cost- Reimbursement, Time-and-Materials, or Labor-Hour Contracts) clause and paragraph (c) of the Insurance--Liability to Third Persons clause), the Contractor shall not (1) be relieved of liability for damage to, or loss or destruction of, aircraft sustained during flight or (2) be reimbursed for liabilities to third persons for loss of or damage to property or for death or bodily injury caused by aircraft during flight, unless the flight crew members have previously been approved in writing by the Contracting Officer.

(b) For the purposes of this clause--

    (1) Unless otherwise specifically provided in the Schedule, "aircraft" includes any aircraft, whether furnished by the Contractor under this contract (either before or after Government acceptance) or furnished by the Government to the Contractor under this contract, including all Government property placed or installed or attached to the aircraft, unless the aircraft and property are covered by a separate bailment agreement.

    (2) "Flight" includes any flight demonstration, flight test, taxi test, or other flight made in the performance of this contract, or for the purpose of safeguarding the aircraft, or previously approved in writing by the Contracting Officer.

        (i) With respect to land-based aircraft, flight commences with the taxi roll from a flight line and continues until the aircraft has completed the taxi roll to a flight line.

        (ii) With respect to sea-planes, flight commences with the launching from a ramp and continues until the aircraft has completed its landing run and is beached at a ramp.

        (iii) With respect to helicopters, flight commences upon engagement of the rotors for the purpose of take-off and continues until the aircraft has returned to the ground and rotors are disengaged.

        (iv) With respect to vertical take-off aircraft, flight commences upon disengagement from any launching platform or device and continues until the aircraft has been re-engaged to any launching platform or device.

    (3) "Flight crew members" means the pilot, copilot, and, unless otherwise specifically provided in the Schedule, the flight engineer and navigator when required or assigned to their respective crew positions to conduct any flight on behalf of the Contractor.

(c)(1) If any aircraft is damaged, lost, or destroyed during flight and the amount of the damage, loss, or destruction exceeds $100,000 or 20 percent of the estimated cost, exclusive of any fee, of this contract, whichever is less, and if the Contractor is not liable for the damage, loss, or destruction under the Government Property (Cost-Reimbursement, Time-and-Materials, or Labor-Hour Contracts) clause of this contract or under paragraph (a) of this clause, an equitable adjustment for any resulting repair, restoration, or replacement required under this contract shall be made (i) in the estimated cost, the delivery schedule, or both and (ii) in the amount of any fee to be paid to the Contractor, and the contract shall be modified in writing accordingly.

    (2) In determining the amount of adjustment in the fee that is equitable, any fault of the Contractor, its employees, or any subcontractor that materially contributed to the damage, loss, or destruction shall be taken into consideration.

(End of clause)

NONE, but (2), in determining the amount of adjustment in the fee that is equitable, any fault of the Contractor, its employees, or any subcontractor that materially contributed to the damage, loss, or destruction shall be taken into consideration.

Prime’s Interest;
Time and Materials ✖ FFP ✖ (Applies to contracts for the development, production, modification, maintenance, or overhaul of aircraft, or otherwise involving the furnishing of aircraft to the contractor, except when the aircraft are covered by a separate bailment.);

52.209-10 Prohibition on Contracting with Inverted Domestic Corporations.

52.214-27 Price Reduction for Defective Certified Cost or Pricing Data-Modifications-Sealed Bidding.

52.215-10 Price Reduction for Defective Certified Cost or Pricing Data.

52.216-24 Limitation of Government Liability.

52.222-12 Contract Termination-Debarment.

52.222-50 Combating Trafficking in Persons.

52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026.

52.228-1 Bid Guarantee.

52.228-8 Liability and Insurance-Leased Motor Vehicles.

52.232-27 Prompt Payment for Construction Contracts.

52.236-23 Responsibility of the Architect-Engineer Contractor.

52.242-3 Penalties for Unallowable Costs.

52.246-16 Responsibility for Supplies.

52.246-18 Warranty of Supplies of a Complex Nature.

52.246-19 Warranty of Systems and Equipment under Performance Specifications or Design Criteria.

52.246-21 Warranty of Construction.

52.247-21 Contractor Liability for Personal Injury and/or Property Damage.

52.247-22 Contractor Liability for Loss of and/or Damage to Freight other than Household Goods.

52.247-23 Contractor Liability for Loss of and/or Damage to Household Goods.

52.247-58 Loading, Blocking, and Bracing of Freight Car Shipments.

52.215-11 Price Reduction for Defective Certified Cost or Pricing Data-Modifications..

252.237-7025 Preaward Transparency Requirements for Firms Offering to Support Department of Defense Audits—Representation and Disclosure.

252.237-7026 Postaward Transparency Requirements for Firms that Support Department of Defense Audits.

252.228-7007 Public Aircraft and State Aircraft Operations—Liability.

252.227-7019 Validation of Asserted Restrictions--Computer Software.

252.227-7037 Validation of Restrictive Markings on Technical Data.

252.247-7007 Liability and Insurance.

252.247-7014 Demurrage.

252.247-7016 Contractor Liability for Loss or Damage.

1852.227-88 Government-furnished computer software and related technical data.

1852.228-70 Aircraft Ground and Flight Risk.

1852.228-76 Cross-Waiver of Liability for International Space Station Activities.

1852.228-78 Cross-Waiver of Liability for Science or Space Exploration Activities Unrelated to the International Space Station.

1852.228-80 Insurance - Immunity From Tort Liability.

1852.228-81 Insurance - Partial Immunity From Tort Liability.

1852.228-82 Insurance - Total Immunity From Tort Liability.

1852.236-73 Hurricane Plan.

1852.245-72 Liability for Government property furnished for repair or other services.

1852.245-71 Installation-accountable Government Property.

3052.209-71 Reserve Officer Training Corps and military recruiting on campus.

3052.217-93 Subcontracts (USCG).

3052.217-95 Liability and insurance (USCG).

3052.217-97 Discharge of liens (USCG).

3052.217-99 Department of Labor Safety and Health Regulations for ship repairing (USCG).

3052.217-100 Guarantee (USCG).

3052.222-70 Strikes or picketing affecting timely completion of the contract work.

3052.222-71 Strikes or picketing affecting access to a DHS facility.

5352.223-9001 Health and Safety on Government Installations

5152.225-5900 Arming Requirements and Procedures for Personal Security Services Contractors and Requests for Personal Protection

5152.225-5903 Compliance with Laws and Regulations

5152.228-5900 Government Liability for Non-Tactical Vehicles

5152.225-5902 Fitness for Duty and Medical/Dental Care Limitations

5152.225-5915 CONTRACTOR ACCOUNTABILITY AND PERSONNEL RECOVERY

552.236-73 Subcontracts.

552.211-70 Substantial Completion.

552.211-76 Charges for Packaging, Packing, and Marking.

552.236-80 Accounting Records and Progress Payments.

552.211-89 Non-Manufactured Wood Packaging Material for Export.

552.236-71 Contractor Responsibilities.

552.236-82 Subcontracts.

552.270-7 Fire and Casualty Damage.

652.236-70 Accident Prevention.

1452.204-70 Release of Claims.

1452.236-72 Preservation of historical and archeological data.

1452.228-72 Liability for Loss or Damage - Department of the Interior.

Working with a set of FAR clauses from an RFP or contract?

Try pasting them into our tool to instantly generate a risk profile, including the basic flow down recommendation.

Info

Works best with Chrome and Edge browsers!