GSA 552.236-71 Contractor Responsibilities. Alt II (Jan 2020) (Current)

As prescribed in 536.571, insert the clause at 552.236-71, Contractor Responsibilities, in solicitations and contracts if construction, dismantling, demolition, or removal of improvements is contemplated. Use the clause:

      (a)  With its Alternate I when a design-build project delivery method will be followed.

      (b)  With its Alternate II when a construction-manager-as-constructor project delivery method will be followed.
 

Contractor Responsibilities Alternate II (Jan 2020).

As prescribed in 536.571(b), delete paragraphs (d), (e), (f), and (g) of the basic clause, and insert paragraphs (d), (e), (f), (g), (h), (i), and (j) as follows:

(d) The Contractor shall be responsible for performing the design phase services in accordance with the statement of work. The Contractor shall submit all deliverables and reports in accordance with the statement of work.

(e) The Contractor shall be responsible to review all design information (e.g. draft specifications and drawings) provided. The Contractor shall be responsible for determining that the project as described in the design information is constructible using commercially practicable means and methods; that the construction work is described in the design documents with sufficient completeness to enable pricing of a complete project within the guaranteed maximum price; and that the manner of presentation and organization of information in the design documents enables accurate estimation of the cost of the work.

(f) Prior to establishment of the final estimated cost of work, the Contractor shall bring to the Contracting Officer's attention all instances that it has discovered or has been made aware of where design errors and omissions affect the Contractor's ability to accurately estimate the cost of the work.

(g) Where installation of separate work components as shown in the contract will result in conflict or interference between such components or with existing conditions, including allowable tolerances, it is the Contractor's responsibility to bring such conflict or interference to the attention of the Contracting Officer and seek direction before fabrication, construction, or installation of any affected work. If the Contractor fabricates, constructs, or installs any work prior to receiving such direction, the Contractor shall be responsible for all cost and time incurred to resolve or mitigate such conflict or interference.

(h) Where drawings show work without specific routing, dimensions, locations, or position relative to other work or existing conditions, and such information is not specifically defined by reference to specifications or other information supplied in the contract, the Contractor is responsible for routing, dimensioning, and locating such work in coordination with other work or existing conditions in a manner consistent with contract requirements.

(i) It is not the Contractor's responsibility to ensure that the contract documents comply with applicable laws, statutes, building codes and regulations. If it comes to the attention of the Contractor that any of the contract documents do not comply with such requirements, the Contractor shall promptly notify the Contracting Officer in writing. If the Contractor performs any of the work prior to notifying and receiving direction from the Contracting Officer, the Contractor shall assume full responsibility for correction of such work, and any fees or penalties that may be assessed for non-compliance.

(j) The Contractor is responsible to construct the project in accordance with the drawings and specifications. The final Estimated Cost of the Construction Work (ECW) may be determined based upon incomplete design documents. In those instances in which the drawings and specifications are not complete at the time the final ECW is established, the Contractor shall exercise reasonable care and judgment to determine the intent of the design and shall calculate the final ECW on the basis of the quality of construction, materials, and finishes that can be reasonably inferred from the design documents or other specified sources.
 

 

NONE

Services ✖ Supplies ✖ Subcontractor ✖ Demolition ✔ Construction ✔ (Applies when a construction-manager-as-constructor project delivery method will be followed.)

52.209-10 Prohibition on Contracting with Inverted Domestic Corporations.

52.214-27 Price Reduction for Defective Certified Cost or Pricing Data-Modifications-Sealed Bidding.

52.215-10 Price Reduction for Defective Certified Cost or Pricing Data.

52.216-24 Limitation of Government Liability.

52.222-12 Contract Termination-Debarment.

52.222-50 Combating Trafficking in Persons.

52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026.

52.228-1 Bid Guarantee.

52.228-8 Liability and Insurance-Leased Motor Vehicles.

52.232-27 Prompt Payment for Construction Contracts.

52.236-23 Responsibility of the Architect-Engineer Contractor.

52.242-3 Penalties for Unallowable Costs.

52.246-16 Responsibility for Supplies.

52.246-18 Warranty of Supplies of a Complex Nature.

52.246-19 Warranty of Systems and Equipment under Performance Specifications or Design Criteria.

52.246-21 Warranty of Construction.

52.247-21 Contractor Liability for Personal Injury and/or Property Damage.

52.247-22 Contractor Liability for Loss of and/or Damage to Freight other than Household Goods.

52.247-23 Contractor Liability for Loss of and/or Damage to Household Goods.

52.247-58 Loading, Blocking, and Bracing of Freight Car Shipments.

52.215-11 Price Reduction for Defective Certified Cost or Pricing Data-Modifications..

252.237-7025 Preaward Transparency Requirements for Firms Offering to Support Department of Defense Audits—Representation and Disclosure.

252.237-7026 Postaward Transparency Requirements for Firms that Support Department of Defense Audits.

252.228-7007 Public Aircraft and State Aircraft Operations—Liability.

252.227-7019 Validation of Asserted Restrictions--Computer Software.

252.227-7037 Validation of Restrictive Markings on Technical Data.

252.247-7007 Liability and Insurance.

252.247-7014 Demurrage.

252.247-7016 Contractor Liability for Loss or Damage.

1852.245-71 Installation-accountable Government Property.

1852.227-88 Government-furnished computer software and related technical data.

1852.228-70 Aircraft Ground and Flight Risk.

1852.228-71 Aircraft Flight Risks.

1852.228-76 Cross-Waiver of Liability for International Space Station Activities.

1852.228-78 Cross-Waiver of Liability for Science or Space Exploration Activities Unrelated to the International Space Station.

1852.228-80 Insurance - Immunity From Tort Liability.

1852.228-81 Insurance - Partial Immunity From Tort Liability.

1852.228-82 Insurance - Total Immunity From Tort Liability.

1852.236-73 Hurricane Plan.

1852.245-72 Liability for Government property furnished for repair or other services.

3052.217-93 Subcontracts (USCG).

3052.217-95 Liability and insurance (USCG).

3052.217-97 Discharge of liens (USCG).

3052.217-99 Department of Labor Safety and Health Regulations for ship repairing (USCG).

3052.217-100 Guarantee (USCG).

3052.222-70 Strikes or picketing affecting timely completion of the contract work.

3052.222-71 Strikes or picketing affecting access to a DHS facility.

5352.223-9001 Health and Safety on Government Installations

5152.225-5900 Arming Requirements and Procedures for Personal Security Services Contractors and Requests for Personal Protection

5152.225-5903 Compliance with Laws and Regulations

5152.228-5900 Government Liability for Non-Tactical Vehicles

5152.225-5902 Fitness for Duty and Medical/Dental Care Limitations

5152.225-5915 CONTRACTOR ACCOUNTABILITY AND PERSONNEL RECOVERY

552.236-73 Subcontracts.

552.211-70 Substantial Completion.

552.211-76 Charges for Packaging, Packing, and Marking.

552.236-80 Accounting Records and Progress Payments.

552.211-89 Non-Manufactured Wood Packaging Material for Export.

552.236-82 Subcontracts.

552.270-7 Fire and Casualty Damage.

652.236-70 Accident Prevention.

1452.204-70 Release of Claims.

1452.236-72 Preservation of historical and archeological data.

1452.228-72 Liability for Loss or Damage - Department of the Interior.

752.222-71 Nondiscrimination.

752.239-71 Information and Communication Technology Accessibility.